Mazda Building, Sheffield

The Mazda Building Scheme consisted of the conversion of existing offices to a retail unit with 3 apartments above the Campo Lane frontage and the conversion of the Victorian Warehouse premises on the St Peters close frontage to form offices at Basement and Groundfloor levels together with 9 apartments on the upper floors.

 

The buildings all fall within the Cathedral Conservation area, the Campo Lane façade dates back to 1920 and is brick with decorative ashlar stone and a flat asphalt roof behind the parapet. The section of the building on the St Peters close frontage is brickwork with stone cills, mullions and string courses. The roof is of pitched slate construction to a curved plan under substantial timber trusses. A section of the basement vaulting was removed to form a new access and stairs to the offices and the existing passageway forming the resident's entrance. The internal floors are linked with a wide cantilevered 1920's terrazzo staircase which has been tastefully refurbished.

 

The works included:

 

  • Demolition of certain areas.
  • Refurbishment of all roofs i.e. install new roof lights, re-slate, guttering, down pipes and timber treatment.
  • Refurbish façades - brickwork, cills, mullions etc.
  • Refurbish windows, fit some new, including new entrance screen.
  • Install all fireproofing, floors, walls etc. to comply with current regulations.
  • Form apartment internal walls and ceilings with metal stud system.
  • Composite floors.
  • Some internal walls were sand-blasted leaving feature exposed brickwork with exposed timber and steel.
  • Every apartment has a fully integrated state of the art Euromobil kitchen, appliances included stainless steel ovens and hobs by Nef together with fridge, freezer and dishwasher.
  • State of the art bathrooms were installed using Saneux sanitary ware, with walls being furnished with high quality large format tiles.
  • Floors were covered with 15mm thickness satin finish Merbau flooring to living rooms and kitchen areas. Seagrass broadloom carpets were installed in bedrooms and hallways.
  • Leader flush door sets were installed with ironmongery furnished in solid satin stainless steel.
  • Electric convection heating systems were installed to each apartment.
  • Satellite T.V. points were installed to Living area and 1 bedroom.
  • Video/audio access control system from the main entrance was installed to each apartment.
  • Offices and the retail unit were all furnished to a high standard ready for occupancy by tenants.

 

More Residential Projects »

Mazda Building, Sheffield , Jessops Construction Ltd
Back to top

Category:
RESIDENTIAL

 

Area:
SHEFFIELD

 

Location:
SOUTH YORKSHIRE

 

Client:
CITTA DEVELOPMENTS LTD

 

Architect:
AXIS ARCHITECTURE

 

Structural engineer:
ROSSCOE CAPITA

 

Form of contract:
-

 

Value:
£840,000

 

Project period:
39 WEEKS