Jessops Construction took on the 72 bedroomed Travelodge rectification scheme on behalf of client Cosmos Ventures Ltd.

This project was particularly challenging, the previous developer had gone into administration and the site was left untouched for the best part of two years. The surrounding businesses and residents were unsatisfied with the unsightly appearance of the site and this caused many frustrations.

Externally, the unsafe scaffolding was struck and removed from site then replaced progressively with 'new' including protective sheeting to the public facing elevations which was contained behind corporate hoarding. The masonry façade had to be dismantled on a brick by brick basis, then removed to waste skips at the rear of the building via the hotel corridors and scaffold walkways. The removal facilitated repairs to the timber frame, install of a new breather membrane and certified fire protection barriers by an accredited installer fitted both vertically and horizontally in the cavity construction. The existing windows were refurbished then re-fitted.The brickwork façade was then rebuilt around the building followed by render to some elevations as the approved planning drawings. The main roofs had suffered from water ingress, the existing insulation and coverings were removed and replaced with 'new' these works included some replacement decking boards.

Internally, after a few weeks of intensive surveys and validations of the existing services, remedial work was undertaken to a number of elements. These include electrics, pipework, comfort cooling, ventilation and the timber frame whereby Jessops undertook repairs to water damaged staircases and stairwells. All external walls and party walls were stripped of the board finishes to install a new vapour control layer that was not installed by the previous developer. On a floor by floor basis the rooms were then boarded and dry-lined or skimmed then completed after decoration and fit-out works. During completion of the M&E works an accredited installer completed all the certified fire protection works, this work took about 13 weeks to complete including comprehensive documenting for traceability purposes.

 

More Mixed Use Schemes Projects »

TRAVELODGE & PUREGYM, EAST GRINSTEAD, Jessops Construction Ltd
TRAVELODGE & PUREGYM, EAST GRINSTEAD, Jessops Construction Ltd
TRAVELODGE & PUREGYM, EAST GRINSTEAD, Jessops Construction Ltd
TRAVELODGE & PUREGYM, EAST GRINSTEAD, Jessops Construction Ltd
Back to top

Category:
MIXED USE SCHEMES

 

Area:
West Sussex

 

Location:
East Grinstead

 

Client:
Cosmos Ventures Ltd.

 

Architect:
BHD Architects

 

Structural engineer:
Dixon Hurst Consulting

 

Form of contract:
JCT Design & Build Contract, 2011 Edition

 

Value:
£4.6million

 

Project period:
50weeks