RETAIL UNIT PHASE 1
PROJECT DESCRIPTION
The basis of this project was to increase the office and storage space of the building, by adding two new extensions, reconfiguring internal areas, whilst also additionally updating the mechanical and electrical systems throughout the whole store.
Both extensions were constructed on plied foundations, with a reinforced concrete ring beam and slab. The remainder of the structu...
[view project] |
.jpg) |
RETAIL UNIT PHASE 2
PROJECT DESCRIPTION
Following the successful completion of the phase one work to the store, we were awarded a second phase, which comprised of further refurbishment throughout the main sales floor and warehouse areas. This was divided into six phases, with staggered commencement dates to minimise disruption to the store's operations.
The majority of the work within five of the areas consisted of...
[view project] |
.jpg) |
BLUE BOAR RETAIL UNIT
PROJECT DESCRIPTION
The project comprised of the construction of a two storey new 14,000 ft2 retail unit as an extension of the newly constructed retail centre in the centre of Loughborough known as ‘The Rushes'.
The unit was designed and constructed in such a way that the unit could be let as one large unit or two small units.
Part of the site was formerly a pub which has recently been d...
[view project] |
.jpg) |
RETAIL UNIT
PROJECT DESCRIPTION
The project provides 3,000ft2 of retail space for Savers, a national chain of health and beauty product suppliers.
The building (formerly a public house) has been completely refurbished. All but two existing side walls were removed on the ground floor to provide maximum retail space, this was achieved by the incorporation of a series of steel columns and beams in lieu of load...
[view project] |
.JPG) |
ALL THINGS CHOCOLATE
Whilst carrying out the apartments (link) works for Hammersons on the Shire shopping centre we were invited to assist with the fitting out of the units in the main mall and this lead to the works for All Things Chocolate. This unit was a critical one location wise being situated right next to the point where the 'old' centre met with the 'new.' Fi...
[view project] |
.jpg) |
Mazda Building
The Mazda Building Scheme consisted of the conversion of existing offices to a retail unit with 3 apartments above the Campo Lane frontage and the conversion of the Victorian Warehouse premises on the St Peters close frontage to form offices at Basement and Ground floor levels together with 9 apartments on the upper floors.
The buildings all fall within the Cathedral Conservation area, the Campo ...